502 research outputs found

    Building information modelling (BIM) implementation and remote construction projects: issues, challenges, and critiques.

    Get PDF
    The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique and even more complicated challenging problems in relation to communication and management due to the remoteness of the construction sites. On the other hand, Building Informational Modelling (BIM) is offered by some as the panacea to addressing the interdisciplinary inefficiencies in construction projects. Although in many cases the adoption of BIM has numerous potential benefits, it also raises interesting challenges with regards to how BIM integrates the business processes of individual practices. This paper aims to show how BIM adoption for an architectural company helps to mitigate the management and communication problems in remote construction project. The paper adopts a case study methodology, which is a UK Knowledge Transfer Partnership (KTP) project of BIM adoption between the University of Salford, UK and John McCall Architects (JMA), in which the BIM use between the architectural company and the main contractor for a remote construction project is elaborated and justified. Research showed that the key management and communication problems such as poor quality of construction works, unavailability of materials, and ineffective planning and scheduling can largely be mitigated by adopting BIM at the design stage

    Knowledge and technology transfer from universities to industries: A case study approach from the built environment field

    Get PDF
    Enabling kowledge societies and knowledge based economies is a key policy in the UK. KTP (Knowledge Transfer Partnership) scheme initiated by the Technology Strategy Board is a pathway for collaboration and partnerships between Higher Education institutions and companies to transfer innovative knowledge based solutions from universities to businesses in order to equip them with the leading edge knowledge and technology infrastructure for sustainable long term competitive advantages in both national and international market. The paper explains a KTP project between the University of Salford and John McCall Architects (JMA) in Liverpool in the UK that aimed to identify, map and re-engineer JMA’s strategic and operational change processes through Lean thinking and the implementation of Building Information Modelling (BIM), which is a foundational tool for implementing an efficient process and invariably leads to lean-orientated, team based approach to design and construction by enabling the intelligent interrogation of designs; provide a quicker and cheaper design production; better co-ordination of documentation; more effective change control; less repetition of processes; a better quality constructed product; and improved communication both for JMA and across the supply chain whereas it provided opportunity to increase business relevance of knowledge based research and teaching for the Higher Education. Case Study approach is employed in the paper and the KTP project is assessed for i) how it helped in improving JMA’s knowledge and technology capacity in conducting their practice, and, ii) how it helped the university in improving its knowledge based research and teaching

    The changing perception in the artefacts used in the design practice through BIM adoption

    Get PDF
    When CAD (Computer Aided Design) was generally adopted in the early 1990’s, the hand drawn process was replaced with the CAD drawing but the nature of the artefacts / deliverables and the exchanges of information between disciplines remained fundamentally the same. The deliverables remained 2D representations of 3D forms and Specifications and Bill of Quantities. However, the building industry is under great pressure to provide value for money, sustainable design and construction. This has propelled the adoption of Building Information Modelling (BIM). BIM is a foundational tool for a team based lean design approach. It can enable the intelligent interrogation of design; provide a quicker and cheaper design production; better co-ordination of documentation; more effective change control; less repetition of processes; a better quality constructed product; and improved communication both for the architectural practice and across the supply chain. As BIM enables a new of working methodology, it entails the change in perceiving artefacts used and deliverables produced in the design and construction stages. In other words, defining what the informational issues are, who does what and who is responsible for what and the level of detail required at each stage in design and construction is critically important to adopt and implement BIM in the construction sector. This paper presents the key findings through the action research methodology about the change in the nature of artefacts and deliverables resulting from the BIM adoption in the KTP (Knowledge Transfer Partnership) project undertaken by the University of Salford and John McCall Architects

    BIM adoption and implementation for architectural practices

    Get PDF
    Severe issues about data acquisition and management arise during the design creation and development due to complexity, uncertainty and ambiguity. BIM (Building Information Modelling) is a tool for a team based lean design approach towards improved architectural practice across the supply chain. However, moving from a CAD (Computer Aided Design) approach to BIM (Building Information Modelling) represents a fundamental change for individual disciplines and the construction industry as a whole. Although BIM has been implemented by large practices, it is not widely used by SMEs (Small and Medium Sized Enterprises). Purpose: This paper aims to present a systematic approach for BIM implementation for Architectural SMEs at the organizational level Design/Methodology/Approach: The research is undertaken through a KTP (Knowledge transfer Partnership) project between the University of Salford and John McCall Architects (JMA) a SME based in Liverpool. The overall aim of the KTP is to develop lean design practice through BIM adoption. The BIM implementation approach uses a socio-technical view which does not only consider the implementation of technology but also considers the socio-cultural environment that provides the context for its implementation. The action research oriented qualitative and quantitative research is used for discovery, comparison, and experimentation as it provides �learning by doing�. Findings: The strategic approach to BIM adoption incorporated people, process and technology equally and led to capacity building through the improvements in process, technological infrastructure and upskilling of JMA staff to attain efficiency gains and competitive advantages. Originality/Value: This paper introduces a systematic approach for BIM adoption based on the action research philosophy and demonstrates a roadmap for BIM adoption at the operational level for SME companie

    The key performance indicators of the BIM implementation process

    Get PDF
    Contemporarily some firms in the construction industry are attempting to adopt a BIM method of working. Each of these attempts reflects a varying BIM adoption philosophy and inevitably different BIM technologies, implementation strategies and roadmaps. On the other hand, all these attempts are often motivated to attain competitive advantages for product delivery in the market place. The question of what the best method of adopting BIM has not been answered yet. That is to say, it is required to identify a standard method that will benchmark the different BIM adoption cases by comparing the efficiency gains in these cases: a standard benchmarking method can help the stakeholders to decide on the most appropriate strategies for themselves. This paper explains the live experience of BIM adoption in a KTP (Knowledge Transfer Partnership) project, undertaken between the University of Salford and John McCall Architects practicing in the housing and regeneration fields, with a particular focus on a set of KPIs that have been developed and tested through the action research strategy in the project. Weighting of these KPI’s has been developed from an architectural business perspectiv
    • …
    corecore